Installation guidelines
-The panels should be installed in a clean and dust-free environment.
-The ideal temperature for the panels is between - (60F) and 30c (85F) where the relative humidity does not exceed 70 %.
-Panels must be stored on site 24 hours before installation.
-The hanging surface should be clean and dust free.
-After all panels have been installed, minor adjustment can be made to ensure proper alignment and jointing.
-The installation contractor shoul have a minimum of five years experience with this type of work, and should have a qualified and experienced staff.