banner1
 
 
Anchors FAQs Contacts

Frequently Asked Questions

Are there any special consideration for maintenance and handling ... ?

Yes...

  • The panels should be stacked fabric to fabric and back to back.
  • Installers and handlers should always wear clean cotton gloves to ensure the good condition of the panels.
  • Cleaning should be done with a vacuum and a soft brush attachment.
  • Cleaning of vinyls may be done with some mild soap and a well wrung cloth. The cloth should be only damp to the touch. This will prevent clogging of the perforations and ensure the acoustic properties of the panel.
  • Avoid use of alcohol or petrolium based cleaners.
  • Always test your cleaning product on a hidden area of the panel (ie. back side) to be sure you do not damage the panel.

Are there any special guidelines, or installation procedures...?

Yes,

  • The panels should be installed in a clean and dust-free environment.
  • The ideal temperature for the panels is between - (60F) and 30c (85F) where the relative humidity does not exceed 70 %.
  • Panels must be stored on site 24 hours before installation.
  • The hanging surface should be clean and dust free.
  • After all panels have been installed, minor adjustment can be made to ensure proper alignment and jointing.
  • The installation contractor shoul have a minimum of five years experience with this type of work, and should have a qualified and experienced staff.

call us for help

Thank-you for your business